It addresses the following MasterFormat Sections and LEED credits by providing commentary and sample specification language:
- Section 01 14 19 – Use of Site for requirements related to LEED SS Credit 5.1: Site Development—Protect or Restore Habitat and IEQ Prerequisite 2: Environmental Tobacco Smoke (ETS) Control.
- Section 01 32 13 – Scheduling of Work for requirements related to Scheduling requirements of Chapter 3, “Control Measures,” of ANSI/SMACNA 008 referenced in LEED IEQ Credit 3.1: Construction Indoor Air Quality Management Plan—During Construction.
- Section 01 33 29 – Sustainable Design Reporting for requirements related to Sustainable Design Submittals and LEED Online forms.
- Section 01 56 00 – Temporary Barriers and Enclosures for requirements related to Pathway Interruption requirements of Chapter 3, “Control Measures,” of ANSI/SMACNA 008 referenced in LEED IEQ Credit 3.1: Construction Indoor Air Quality Management Plan—During Construction.
- Section 01 57 23 – Temporary Storm Water Pollution Control for requirements related to LEED SS Prerequisite 1: Construction Activity Pollution Prevention.
- Section 01 66 00 – Product Storage and Handling Requirements for requirements related to LEED IEQ Credit 3.1: Construction Indoor Air Quality Management Plan—During Construction.
- Section 01 74 13 – Progress Cleaning for requirements related to Housekeeping requirements of Chapter 3, “Control Measures,” of ANSI/SMACNA 008 referenced in LEED IEQ Credit 3.1: Construction Indoor Air Quality Management Plan—During Construction.
- Section 01 74 19 – Construction Waste Management and Disposal for requirements related to LEED MR Credit 2: Construction Waste Management.
- Section 01 74 23 – Final Cleaning for requirements related to LEED IEQ Credit 3.1: Construction Indoor Air Quality Management Plan—During Construction and IEQ Credit 3.2: Construction Indoor Air Quality Management Plan—Before Occupancy.
- Section 01 81 19 – Indoor Air Quality Requirements for requirements related to LEED IEQ Credit 3.2: Construction Indoor Air Quality Management Plan—Before Occupancy.
- Section 01 91 13 – General Commissioning Requirements for Contractor’s obligations related to LEED EA Prerequisite 1: Fundamental Commissioning of Building Energy Systems and EA Credit 3: Enhanced Commissioning. The Commissioning itself is not in contract.
- Divisions 02 through 09 for requirements related to LEED Materials & Resources and Indoor Environmental Quality credits.
- Section 07 30 00 – Steep Slope Roofing and Section 07 50 00 – Membrane Roofing for requirements related to LEED SS Credit 7.1: Heat Island Effect—Nonroof and SS Credit 7.2: Heat Island Effect—roof.
- Section 07 55 63 – Vegetated Protected Membrane Roofing for requirements related to LEED SS Credit 6.1: Stormwater Design—Quantity Control, SS Credit 6.2: Stormwater Design—Quality Control, SS Credit 7.1: Heat Island Effect—Nonroof, and SS Credit 7.2: Heat Island Effect—Roof.